
PLOT #6 CVR B
In the attic, Chase has drowned. Outside, the floodwaters rise. Trapped and separated within the manor, the Blaines confront the source of their anguish.
ORDER/SHIPPING DATES
FOC 7/27/2020
Est Ship 8/19/2020
In the attic, Chase has drowned. Outside, the floodwaters rise. Trapped and separated within the manor, the Blaines confront the source of their anguish.
FOC 7/27/2020
Est Ship 8/19/2020